03 · Design & deliver
Photovoltaic Feasibility & System Design
Bankable owner-side PV studies and end-to-end engineering: IRR 12-22%, payback 5-7 years, rooftop and carport.
Overview
From pre-screening to Owner’s Engineer supervision: site assessment, sizing, electrical design, shading studies and grid-connection pathways across DEWA, ADDC, AADC, SEWA, FEWA and EtihadWE.

Outcomes
- IRR typically 12-22%
- Payback typically 5-7 years
- Grid-connection pathway per emirate
- Independent design: no EPC commissions
Deliverables
- 01Feasibility report (50-100 pages)
- 02Yield model (PVsyst)
- 03Electrical & structural concept
- 04Grid application support pack
Next step
Have a building that should perform better?
Tell us about the asset. We respond within 48 hours.