Skip to content

03 · Design & deliver

Photovoltaic Feasibility & System Design

Bankable owner-side PV studies and end-to-end engineering: IRR 12-22%, payback 5-7 years, rooftop and carport.

Overview

From pre-screening to Owner’s Engineer supervision: site assessment, sizing, electrical design, shading studies and grid-connection pathways across DEWA, ADDC, AADC, SEWA, FEWA and EtihadWE.

Outcomes

  • IRR typically 12-22%
  • Payback typically 5-7 years
  • Grid-connection pathway per emirate
  • Independent design: no EPC commissions

Deliverables

  1. 01Feasibility report (50-100 pages)
  2. 02Yield model (PVsyst)
  3. 03Electrical & structural concept
  4. 04Grid application support pack

Next step

Have a building that should perform better?

Tell us about the asset. We respond within 48 hours.