Skip to content

References

European energy project references from our French group.

Selected projects delivered by the French group in Europe, illustrating the engineering experience that supports Netz Energy's UAE advisory work.

These references describe the French group's work in Europe. They are not presented as projects delivered by Netz Energy in the UAE; the local scope and applicable methods are established for each new engagement.

SOMFY

Industrial / commercial

Floor area
101,000 m²
Site scope
5 sites

Decarbonization of industrial sites

The French group supports SOMFY in defining and implementing its decarbonization strategy across five European sites comprising production units, offices, laboratories and logistics warehouses.

  • Technical audit
  • Decarbonization strategy
  • Master plan
  • CAPEX plan
  • Works roadmap
  1. 01Phase 1: technical audits and decarbonization studies, plus studies on renewable and recovered energy supply, to identify levers and design the real-estate and environmental master plan.
  2. 02Phase 2 (2025-2029): management of the decarbonization roadmap, design and progressive implementation of improvement actions.

Explore related services in the UAE

IKEA

Logistics / retail

Floor area
88,700 m²
Site scope
3 sites

Decarbonization of logistics sites

Support for IKEA across three sites (logistics & storage, offices, distribution and retail): from technical audits and monitoring to operational master planning and progressive implementation.

  • 360° technical audit
  • Regulatory compliance
  • Decarbonization strategy
  • Master plan
  • CAPEX plan
  • Energy management
  1. 01Phase 1: technical audits and energy monitoring to identify levers and design the operational, real-estate and environmental master plan.
  2. 02Phase 2: equipment inventory (one site), energy management with reporting, and progressive design and implementation of actions.

Explore related services in the UAE

FNAC DARTY

Logistics / storage

Floor area
78,000 m²
Site scope
1 site

Decarbonization of logistics sites

360° audit aligned with BACS Decree (including BMS deployment) and Tertiary Decree requirements, while supporting BREEAM “VERY GOOD” ambitions.

  • 360° technical audit
  • Tertiary Decree & BACS compliance
  • Renovation strategy
  • CAPEX plan
  • OPERAT declaration
  1. 01Technical and energy audits (Tertiary Decree, BACS Decree, F-Gas).
  2. 02Costed CAPEX works plan and OPERAT declaration.

Explore related services in the UAE

GXO Logistics Europe

Logistics / storage

Floor area
62,140 m²
Site scope
1 site

Decarbonization of logistics sites

Energy strategy for a major logistics asset: audit, costed CAPEX with quick-wins, then design of PV carports and EV charging points.

  • 360° technical audit
  • Regulatory compliance
  • Renovation strategy
  • CAPEX plan
  • PV carports & EV charging design
  1. 01Technical and energy audit with costed CAPEX plan and quick-wins programme.
  2. 02Design of PV carport works plan and EV charging installation.

Explore related services in the UAE

Grape Hospitality

Hospitality

Floor area
72,800 m²
Site scope
11 sites

Decarbonization of hospitality sites

National hospitality portfolio: technical and energy audits incorporating regulatory requirements, costed CAPEX, and a second phase of HVAC works design with contractor tendering support.

  • 360° audit
  • Renovation strategy
  • Master plan
  • CAPEX plan
  • HVAC design
  1. 01Audits and costed CAPEX plan including feasibility studies and quick-wins.
  2. 02HVAC works plan design and assistance with contractor tendering and selection.

Explore related services in the UAE

Fondation Léopold Bellan

Healthcare / offices / accommodation

Floor area
21,000 m²
Site scope
5 sites

Decarbonization of mixed-use care sites

Energy strategy across five establishments: audits against regulatory deadlines through 2050, costed CAPEX, and support securing financing for works.

  • 360° audit
  • Renovation strategy
  • Master plan
  • CAPEX plan
  • Financing support
  1. 01Technical and energy audits with costed CAPEX covering 2030-2050 deadlines.
  2. 02Support in securing financing for implementation of energy works.

Explore related services in the UAE

AP-HP: Nanterre

Healthcare

Floor area
23,000 m²
Site scope
4 buildings

Energy renovation strategy

Energy audit of buildings at Rue Lavoisier, Nanterre for A.G.E.P.S / Assistance Publique - Hôpitaux de Paris: including electrical measurements, DES and a costed CAPEX plan for 2030-2050.

  • 360° audit
  • Dynamic Energy Simulation
  • Master plan
  • CAPEX plan
  1. 01Technical and energy audits with electrical consumption measurements.
  2. 02Dynamic Energy Simulation and costed CAPEX works plan.

Explore related services in the UAE

CEREMA: Sourdun

Public / offices

Floor area
8,400 m²
Site scope
4 buildings

Global Performance Contract: energy renovation

As consortium partner, the French group delivered thermal and energy studies for a global performance contract in France covering design, construction and operation: from tender through works delivery.

  • Thermal assessment
  • System sizing
  • Dynamic Thermal Simulation
  1. 01Thermal and airflow assessments for production system sizing.
  2. 02Dynamic Thermal Simulation to estimate energy savings.

Explore related services in the UAE

Pôle emploi: Gonesse

Public / offices

Floor area
4,000 m²
Site scope
1 building

Global Performance Contract: energy renovation

Thermal and energy studies across tender, design, construction and operation: DES for targets, IPMVP M&V plan, energy commissioning and monitoring set-up.

  • Energy studies
  • IPMVP
  • Operation monitoring
  1. 01Dynamic Energy Simulations to estimate savings and set energy targets.
  2. 02IPMVP M&V plan, commissioning during works and energy-monitoring set-up.

Explore related services in the UAE

Next step

Have a building that should perform better?

Tell us about the asset. We respond within 48 hours.