Skip to content

01 · Measure & verify

Energy Metering & Submetering Consultants UAE

Measurement-system sizing, sensor selection and metering-plan design across power, HVAC, water and gas: for building-level monitoring and performance verification.

Overview

We assess the measurement gaps that prevent a site from answering its energy questions. Submetering and gateway options are selected around existing equipment, communications, data access and the decisions the operating team needs to make.

Outcomes

  • Metering plans sized to utility and sub-system reality
  • Sensor selection matched to climate and asset typology
  • Gateway architecture ready for BMS / EMS integration
  • Pass-through equipment supply with no mark-up commissions

Deliverables

  1. 01Instrumentation & metering plan
  2. 02Bill of quantities and datasheets
  3. 03Integration architecture (BMS/EMS)
  4. 04Commissioning checklist for meters & sensors

How the engagement works

  1. Map the utility meters, major loads and reporting boundaries so the proposed scheme answers a defined operational question.
  2. Check sensor ranges, communications and existing BMS access before specifying new devices or gateways.
  3. Define acceptance checks, naming conventions and data-quality responsibilities so the FM team can use the readings after handover.

What to prepare

  • Single-line diagrams, meter inventory and available utility or interval data.
  • BMS architecture, access restrictions and the equipment or tenant loads you need to separate.

Practical preparation and decision guide

Questions about this service

Do we need to replace the existing BMS?

Not necessarily. We first assess which existing meters and interfaces can provide reliable data. Any new hardware is justified against measurement gaps and integration constraints.

Can submetering help allocate tenant energy use?

Yes, provided measurement boundaries match the intended allocation. We distinguish operational monitoring from billing requirements and confirm the applicable utility and contractual rules.

Related services

Relevant sectors

Related group experience

Examples from the French group's European work; these are not UAE projects or certification of this service.

Next step

Have a building that should perform better?

Tell us about the asset. We respond within 48 hours.