
01 · Measure & verify
Energy Audit Services in Dubai & the UAE
Engineering-led diagnostics turned into prioritized Energy Conservation Measures with cost-benefit analysis: 360°, Flash and PVsyst PV audits.
Overview
From an initial assessment to a detailed investigation, we translate site evidence into a ranked register of energy conservation measures. Cost, payback estimates and operating constraints use documented assumptions and the utility conditions relevant to the asset.

Outcomes
- Prioritized ECM catalogue with cost-benefit
- Anomaly detection on major energy consumers
- Operational and investment priorities with estimated costs and benefits
- Identification of site-specific requirements to confirm with the relevant authority
Deliverables
- 01Audit report with evidence, assumptions and recommendations
- 02ECM register with CAPEX / OPEX / IRR
- 03Measurement campaign summary
- 04Executive briefing for asset & finance leads
How the engagement works
- Agree the asset boundary, decision to be supported and available evidence before choosing the depth of the audit.
- Combine site observations with utility records, operating schedules and targeted measurements to identify avoidable consumption.
- Present a ranked action register showing investment assumptions, operational constraints and the measurements needed to verify results.
What to prepare
- Ideally a full year of utility bills, occupancy or production records and major equipment schedules; flag any gaps.
- Current drawings, previous audits and an FM contact who can arrange safe access to plant and BMS trends.
Practical preparation and decision guide
Questions about this service
Which audit level does my building need?
A screening audit can identify priorities. An investment decision usually needs deeper measurements and costing. We scope the work around the decision, the quality of existing data and the complexity of the asset.
Are the estimated savings guaranteed?
An audit estimates opportunities under documented assumptions. Realised savings depend on implementation and operation, and should be assessed against an agreed baseline through measurement and verification.
Related services
Relevant sectors
Related group experience
Examples from the French group's European work; these are not UAE projects or certification of this service.
Next step
Have a building that should perform better?
Tell us about the asset. We respond within 48 hours.